DLA Aviation Operations Center – Phase II

Project Details

Project Size
281,000 SF

Contract Amount
$14M

Customer
Manhattan Construction Company

Architect
Waller, Todd, & Sadler Architects, Inc.

Engineer
US Army Corps of Engineers

Owner
US Federal Government

Project Overview

This is a technical office support building for the Defense Logistics Agency (DLA) aviation division. It is a large building comprising a 5-story tower, 2-story wing, mechanical room, and mechanical yard. The ColonialWebb team installed a water source heat pump system, which includes four custom RTUs, and a geothermal closed circuit cooler system in the exterior yard. The mechanical room contains two natural gas boilers, chilled and hot water pump skids, and multiple vessels. Additionally, the project features ductless split heat pump systems and finned tube radiation heating.

ColonialWebb is responsible for all mechanical and plumbing systems on the project, and the team partnered with local subcontractors to complete the BAS controls and insulation scopes.

Project Highlights

• Prefabrication all of the pump skids for the project were completed by ColonialWebb