House of Raeford (HOR), a poultry plant, has relied on ColonialWebb as a trusted advisor for several years. HOR’s existing condensers were approaching the end of their life cycle, but thanks to a strong partnership, they knew they could reach out to ColonialWebb to handle the project quickly and safely with pristine quality. As a result, not only were we able to replace the existing evaporative condensers, but we were able to upgrade them, giving House of Raeford higher capacity units and sweeper pumps for each basin. It was crucial that the plant remained operational during the project, and we were able to ensure that it happened with careful planning and multiple pump-outs. The condensers were successfully replaced and upgraded, and ColonialWebb and House of Raeford continue to foster an ongoing partnership.
Portfolio » HOR Rose Hill Condenser Replacement
HOR Rose Hill Condenser Replacement
- Rose Hill, NC
- 2022
- Food & Beverage
Project Description
Project Size
Contract Amount
- $820,415
Customer
- House of Raeford
Architect
Engineer
- ColonialWebb
Owner
- House of Raeford
Project Highlights
• Replaced four (4) existing Evaporative Condenser Cells.
• CWC technicians completed pump downs utilizing CW pump-out machine.
• Condensers were replaced during a three (3) day shut-down over a holiday weekend.
• Upper catwalks were customized to meet the existing layout.
• All ammonia valves and piping were replaced.
• Stainless piping & pumps were used for the sweeper system.
• The existing control system was upgraded.
• CWC technicians completed pump downs utilizing CW pump-out machine.
• Condensers were replaced during a three (3) day shut-down over a holiday weekend.
• Upper catwalks were customized to meet the existing layout.
• All ammonia valves and piping were replaced.
• Stainless piping & pumps were used for the sweeper system.
• The existing control system was upgraded.